United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in PJM (Mid-Atlantic, Midwest) (2023 requests) β€” page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown15614.6 GW
Active in queue14.6 GW156 requests
Agreement signed0.0 MW0 requests
Withdrawn11867 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

156 requests Β· page 4 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AI2-459, Berks County
Solar
5.8 MWIn study Berks, PAPJM Mar 2023target 2027
Solar project AI2-470, Mercer County
Solar
5.8 MWIn study Mercer, PAPJM Mar 2023target 2027
Solar project AI2-477, Bedford County
Solar
5.8 MWIn study Bedford, PAPJM Mar 2023target 2027
Solar project AI2-312, Venango County
Solar
5.5 MWIn study Venango, PAPJM Mar 2023target 2022
Solar project AI2-043, Northumberland County
Solar
5.0 MWIn study Northumberland, VAPJM Jan 2023target 2024
Solar project AI2-308, Bedford County
Solar
4.4 MWIn study Bedford, PAPJM Mar 2023target 2024
Page 4 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)