United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in the USA (2020 requests) β page 36
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AG2-012, Fayette County Solar |
0.2 MW | Withdrawn / abandoned |
| Solar project 1233, Bannock County Solar |
0.1 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)719 Β· 47.9 GW
- CAISO (California)107 Β· 46.6 GW
- West (non-ISO utilities)184 Β· 38.3 GW
- Southeast (non-ISO utilities)178 Β· 30.1 GW
- MISO (Midcontinent)195 Β· 27.2 GW
- NYISO (New York)129 Β· 25.5 GW
- SPP (Southwest Power Pool)60 Β· 10.4 GW
- ERCOT (Texas)67 Β· 10.4 GW
- ISO-NE (New England)113 Β· 9,841 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)