🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Pennsylvania

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in Pennsylvania — page 28

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,354164.3 GW
Active in queue12.5 GW231 requests
Agreement signed2,306 MW58 requests
Withdrawn1,354164.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,354 requests · page 28 of 28
ProjectCapacityStatusLocationRegionQueuedOnline
Astra Foods
Gas
0.5 MWWithdrawn / abandoned Delaware, PAPJM Oct 2011target 2012
Solar project AG2-012, Fayette County
Solar
0.2 MWWithdrawn / abandoned Fayette, PAPJM Oct 2020target 2023
Schrack Farms
Other
0.0 MWWithdrawn / abandoned Clinton, PAPJM May 2006target 2006
Solar project X2-034, Lackawanna County
Solar
0.0 MWWithdrawn / abandoned Lackawanna, PAPJM Jun 2011
Page 28 of 28

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)