United States › Grid › Interconnection queues › Pennsylvania
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Pennsylvania — page 28
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Astra Foods Gas |
0.5 MW | Withdrawn / abandoned |
| Solar project AG2-012, Fayette County Solar |
0.2 MW | Withdrawn / abandoned |
| Schrack Farms Other |
0.0 MW | Withdrawn / abandoned |
| Solar project X2-034, Lackawanna County Solar |
0.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)1,309 · 154.9 GW
- NYISO (New York)43 · 8,533 MW
- MISO (Midcontinent)2 · 879 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)