United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in West (non-ISO utilities) — page 20
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hydro project 468, Jerome County Hydro |
0.1 MW | |
| Other project hist_q65, Lemhi County Other |
0.1 MW | |
| Solar project 161, Sublette County Solar · BP America Production Company NA, Inc. |
0.1 MW | |
| Battery storage project 74, Lincoln County Battery storage |
0.1 MW | |
| Other project HLYC, Blaine County Other |
0.1 MW | |
| Solar project 563, Salt Lake County Solar · U of U Solar 2, LLC |
0.0 MW | |
| Gas project 165, Laramie County Gas · University of Wyoming Research Corporation |
0.0 MW | |
| Hydro project 400, Gooding County Hydro |
0.0 MW | |
| Hydro project 352, Clatsop County Hydro · City of Astoria |
0.0 MW | |
| Hydro project 497, Siskiyou County Hydro · Hayward Paul Luckey, Sr. |
0.0 MW | |
| Hydro project 296, Multnomah County Hydro · City of Portland Water Bureau |
0.0 MW | |
| Onshore wind project 282, Box Elder County Onshore wind · ATK Space Systems |
0.0 MW | |
| Gas project 646, Fremont County Gas · American Industrial Laundry |
0.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)529 · 112.4 GW
- PJM (Mid-Atlantic, Midwest)1,192 · 97.6 GW
- ERCOT (Texas)613 · 95.3 GW
- MISO (Midcontinent)514 · 69.7 GW
- West (non-ISO utilities)963 · 64.7 GW
- SPP (Southwest Power Pool)299 · 45.1 GW
- CAISO (California)234 · 37.6 GW
- NYISO (New York)215 · 24.8 GW
- ISO-NE (New England)228 · 16.5 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)