United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in the USA (2016 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Greene County 2 Solar Β· Hecate Energy Greene 2 LLC |
10.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)20 Β· 5,244 MW
- ERCOT (Texas)4 Β· 932 MW
- PJM (Mid-Atlantic, Midwest)10 Β· 470 MW
- NYISO (New York)13 Β· 370 MW
- Southeast (non-ISO utilities)3 Β· 224 MW
- CAISO (California)1 Β· 20.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)