United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Virginia (2022 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown586,071 MW
Active in queue6,071 MW58 requests
Agreement signed0.0 MW0 requests
Withdrawn332,676 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

58 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AH2-400, Rockingham County
Solar
20.0 MWIn study Rockingham, VAPJM Mar 2022target 2026
Solar project AH2-100, Prince Edward County
Solar
20.0 MWIn study Prince Edward, VAPJM Jan 2022target 2023
Gas project AI2-020, Warren County
Gas
19.0 MWIn study Warren, VAPJM Dec 2022target 2022
Solar project AH2-105, Rockingham County
Solar
16.0 MWIn study Rockingham, VAPJM Feb 2022target 2024
Solar project AI1-126, Cumberland County
Solar
10.0 MWIn study Cumberland, VAPJM Sep 2022target 2024
Solar project AH2-137, Amherst County
Solar
10.0 MWIn study Amherst, VAPJM Feb 2022target 2026
Solar + storage project AI1-106, Halifax County
Solar + storage
9.9 MWIn study Halifax, VAPJM Aug 2022target 2023
Solar project AH2-101, Prince Edward County
Solar
5.0 MWIn study Prince Edward, VAPJM Jan 2022target 2023
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)