United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Georgia (2025 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown539,487 MW
Active in queue9,487 MW53 requests
Agreement signed0.0 MW0 requests
Withdrawn133,349 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

53 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 25-IC-1291, Effingham County
Gas
13.5 MWIn study Effingham, GASoutheast Mar 2025target 2030
Gas project 25-IC-1293, Effingham County
Gas
13.5 MWIn study Effingham, GASoutheast Mar 2025target 2032
Gas project 25-IC-1294, Effingham County
Gas
13.5 MWIn study Effingham, GASoutheast Mar 2025target 2033
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)