Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5814.8 GW
Active in queue14.8 GW58 requests
Agreement signed900 MW2 requests
Withdrawn37930.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

58 requests · page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 441, Lewis And Clark County
Gas
12.0 MWIn study Lewis And Clark, MTWest Jan 2023target 2023
Hydro project 458, Broadwater County
Hydro
10.4 MWIn study Broadwater, MTWest Apr 2024
Hydro project T2-077, Bighorn County
Hydro
8.0 MWIn study Bighorn, MTWest Sep 2025
Solar + storage project 440, Lewis And Clark County
Solar + storage
4.6 MWIn study Lewis And Clark, MTWest Jan 2023target 2023
Hydro project 457, Lewis And Clark County
Hydro
2.2 MWIn study Lewis And Clark, MTWest Mar 2024target 2025
Solar project 454, Gallatin County
Solar
2.0 MWIn study Gallatin, MTWest Dec 2023target 2024
Other project G0710, Flathead County
Other
1.6 MWIn study Flathead, MTWest Nov 2021target 2022
Battery storage project G1085, Flathead County
Battery storage
0.3 MWIn study Flathead, MTWest Aug 2025target 2025
Page 2 of 2

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20152025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)