πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in the USA (2011 requests) β€” page 17

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown808106.0 GW
Active in queue4,539 MW21 requests
Agreement signed2,971 MW15 requests
Withdrawn808106.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

808 requests Β· page 17 of 17
ProjectCapacityStatusLocationRegionQueuedOnline
Inspiration Solar C
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Zodiac Solar
Solar
0.1 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2015
Citizen Solar D
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
North Valley Solar
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Inspiration Solar E
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Aspiration Solar D
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2015
Inspiration Solar F
Solar
0.1 MWWithdrawn / abandoned Fresno, CACAISO Mar 2011target 2017
Solar project X2-034, Lackawanna County
Solar
0.0 MWWithdrawn / abandoned Lackawanna, PAPJM Jun 2011
Page 17 of 17

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)