United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Southeast (non-ISO utilities) — page 17
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 957223, Johnston County Solar |
3.6 MW | In study |
| Solar project 977878, Marion County Solar |
3.2 MW | In study |
| Battery storage project 977422, Pender County Battery storage |
3.1 MW | In study |
| Hydro project 658, Loudon County Hydro |
3.0 MW | In study |
| Solar project 968482, Anderson County Solar |
3.0 MW | In study |
| Solar project 972410, Anderson County Solar |
2.5 MW | In study |
| Solar project 966893, Spartanburg County Solar |
2.5 MW | In study |
| Solar project 968499, Greenwood County Solar |
2.0 MW | In study |
| Solar project 956497, Williamsburg County Solar |
1.9 MW | In study |
| Solar project 957017, Wayne County Solar |
1.9 MW | In study |
| Solar project 956474, Marion County Solar |
1.9 MW | In study |
| Solar project 956365, Indian River County Solar |
1.9 MW | In study |
| Coal project GI-42, Randolph County Coal |
1.7 MW | In study |
| Solar project 977127, Anderson County Solar |
1.5 MW | In study |
| Hydro project 977636, Anson County Hydro |
1.5 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)