Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown46255.8 GW
Active in queue3,270 MW17 requests
Agreement signed1,371 MW10 requests
Withdrawn46255.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

462 requests Β· page 10 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 496, Klamath County
Solar
2.0 MWWithdrawn / abandoned Klamath, ORWest Jun 2013target 2014
Other project G0483, Skamania County
Other
2.0 MWWithdrawn / abandoned Skamania, WAWest May 2013target 2014
Solar project Y3-095, Queen Anne's County
Solar
2.0 MWWithdrawn / abandoned Queen Anne's, MDPJM Apr 2013target 2013
Solar project 494, Millard County
Solar Β· Bevan's Point Holdings, LLC
2.0 MWWithdrawn / abandoned Millard, UTWest Mar 2013target 2013
Gas project Z1-115, Philadelphia County
Gas
2.0 MWWithdrawn / abandoned Philadelphia, PAPJM Oct 2013target 2014
Other project 453, Franklin County
Other Β· REUT Origination, LLC
1.6 MWWithdrawn / abandoned Franklin, IDWest Jan 2013target 2013
Hydro project 538, Deschutes County
Hydro
1.1 MWWithdrawn / abandoned Deschutes, ORWest Dec 2013
Hydro project G0482, Lewis County
Hydro
1.0 MWWithdrawn / abandoned Lewis, WAWest Apr 2013target 2013
Hydro project 407, Lemhi County
Hydro
0.8 MWWithdrawn / abandoned Lemhi, IDWest Feb 2013
Solar project Z1-053, Frederick County
Solar
0.3 MWWithdrawn / abandoned Frederick, MDPJM Sep 2013target 2014
Hydro Increase
Hydro
0.1 MWWithdrawn / abandoned Hampden, MAISO-NE Sep 2013target 2014
Other project Y3-081, Adams County
Other
0.1 MWWithdrawn / abandoned Adams, OHPJM Apr 2013
Page 10 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)