WIND Β· OPERATIONAL

Llangwyryfon

Llangwyryfon is a 9.35 MW onshore wind farm in Wales, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Wales
Project stageOperating
  1. PlanningDec 2001 (completed)
  2. ConsentedMar 2003 (completed)
  3. Construction (completed)
  4. OperatingFeb 2004 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
9.35 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SY23 4SR
Coordinates
52.3069, -4.0292

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Llangwyryfon compares

345th of 488largest wind farms in the UK register
27th of 43in Wales
0.03%of listed UK wind farms capacity
β‰ˆ 21 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 9.35 MW station would generate roughly 21 GWh of electricity in a year, similar to the annual use of about 7,890 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Wales All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Westbury Windfarms
Planning authority
Ceredigion
Planning reference
A01/1330
Application submitted
1 December 2001
Permission granted
1 March 2003
Began operating
1 February 2004
Capacity in planning record
9.4 MW
Address
Llangwyryfon, Southeast Aberystwyth Ceredigion, Dyfed
REPD reference
3229

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.