HYDRO Β· OPERATIONAL

Inverlael

Inverlael is a 2.5 MW small hydro scheme in Scotland, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Small Hydro
  • Scotland
Project stageOperating
  1. PlanningMar 2005 (completed)
  2. ConsentedJul 2007 (completed)
  3. ConstructionSep 2008 (completed)
  4. OperatingAug 2009 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
2.5 MW
Status
Operational
Technology
Hydro Β· Small Hydro
Operator
RWE Npower
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
57.8217, -5.0625

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Inverlael compares

67th of 125largest hydro schemes in the UK register
59th of 109in Scotland
0.17%of listed UK hydro schemes capacity
β‰ˆ 7.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 35% of the maximum possible output), a 2.5 MW station would generate roughly 7.7 GWh of electricity in a year, similar to the annual use of about 2,840 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Hydroelectric stations generate electricity from water flowing downhill through turbines, either from a reservoir behind a dam or from a river (run-of-river). Most UK hydro capacity is in Scotland and Wales.

All UK hydro schemes and pumped-storage stations Hydro schemes and pumped-storage stations in Scotland All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Inverlael Hydro
Developer / operator
RWE npower
Planning authority
Highland
Planning reference
05/00206/FULRC
Application submitted
14 March 2005
Permission granted
4 July 2007
Construction started
1 September 2008
Began operating
5 August 2009
Capacity in planning record
2.5 MW
Address
Loch Broom Near Ullapool, Highland
REPD reference
426

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.