HYDRO Β· OPERATIONAL

Cuaich Power Station - A,C

Cuaich Power Station - A,C is a 2.5 MW small hydro scheme in Scotland, operated by SSE Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Small Hydro
  • Scotland
Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Key facts

Installed capacity
2.5 MW
Status
Operational
Technology
Hydro Β· Small Hydro
Operator
SSE Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
56.9289, -4.2447

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Cuaich Power Station - A,C compares

67th of 125largest hydro schemes in the UK register
59th of 109in Scotland
0.17%of listed UK hydro schemes capacity
β‰ˆ 7.7 GWhillustrative output a year

At a typical UK load factor for this technology (about 35% of the maximum possible output), a 2.5 MW station would generate roughly 7.7 GWh of electricity in a year, similar to the annual use of about 2,840 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Hydroelectric stations generate electricity from water flowing downhill through turbines, either from a reservoir behind a dam or from a river (run-of-river). Most UK hydro capacity is in Scotland and Wales.

All UK hydro schemes and pumped-storage stations Hydro schemes and pumped-storage stations in Scotland All run by SSE Group

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026