Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.
Cables transfer electricity; their MW ratings are not generating capacity. EGL2 connects Peterhead to Drax. EGL1, EGL3, EGL4 and EGL5 have different endpoints and delivery stages.
Project map
Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.
A separate converter at Netherton Hub is proposed for the 2 GW EGL3 link to West Norfolk. It is distinct from the SpittalβPeterhead converter on the same hub site and from EGL2βs converter at Boddam. The hub has entered civil construction, while EGL3βs marine licence and detailed delivery stages remain separate.
This converter is planned within Netherton Hub near Longside as the southern terminal of the 2 GW, 525 kV SpittalβPeterhead link. The cable comes ashore near Crimond at Rattray Head. Hub civil works are underway; this record does not imply the converter is installed or energised.