Aurelius Data Centre Proposal

In planning

Aurelius is one of ILI’s proposed Stoics sites. ILI reports land rights, grid arrangements and entry into the planning process across the network. Site-specific IT load and annual use remain unverified here.

Sources reviewed 2026-10-08 Β· ILI Group

Project facts

StatusIn planning
Developer / operatorILI Group
RegionNorth Lanarkshire
CountryScotland
Published ratingNot published
Rating definitionNot verified
Connection / routeNorth Lanarkshire
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Grid supply. Site-specific renewable contracts, private-wire supply and annual consumption have not been confirmed in the reviewed source.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. ILI Group project information
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.