🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States / Wind turbines / Wind farm groups

US wind farm directory

Explore turbines grouped by the project name, state and county supplied by the US Wind Turbine Database. These are provisional source-name groups, not verified distinct wind farms or planning boundaries.

13Source-name groups
367Turbines in these groups
602.0 MWSum of known turbine ratings (290 turbines)

Source: USWTDB_V9_1_20260928. Capacity is a sum of known individual turbine ratings, not independently verified project capacity. Turbines without a usable source project name are not grouped.

Interactive wind farm map

Pan and zoom to load groups within the visible area. Markers are approximate average turbine positions, not surveyed project centres.

Loading map…

Browse wind farm groups

Source project nameLocationTurbinesKnown rated MWYears in source
unknown Grant CountyGrant County, West Virginia77Unknown—
Beech RidgeGreenbrier County, West Virginia67100.502010
New Creek WindGrant County, West Virginia49102.502016
Mountaineer Wind Energy Center (Thomas)Tucker County, West Virginia4060.002002
Laurel MountainBarbour County, West Virginia3557.702011
Laurel MountainRandolph County, West Virginia2642.902011
PinnacleMineral County, West Virginia2355.202011–2012
Beech Ridge IIGreenbrier County, West Virginia2056.202020
Black RockGrant County, West Virginia1260.002021
Black RockMineral County, West Virginia1155.002021
Mountaineer Wind Energy Center (Thomas)Preston County, West Virginia46.002002
NedPower Mount Storm, Phase IIGrant County, West Virginia24.002008
NedPower Mount Storm, Phase IGrant County, West Virginia12.002008
Data interpretation: The same source project name may describe more than one development phase; projects may span counties, and differently named records may refer to the same development. Do not use the group count as an authoritative number of wind farms. No current operational status, owner, permit or grid connection is inferred.