United States / Wind turbines / Wind farm groups
US wind farm directory
Explore turbines grouped by the project name, state and county supplied by the US Wind Turbine Database. These are provisional source-name groups, not verified distinct wind farms or planning boundaries.
9Source-name groups
208Turbines in these groups
390.7 MWSum of known turbine ratings (205 turbines)
Source: USWTDB_V9_1_20260928. Capacity is a sum of known individual turbine ratings, not independently verified project capacity. Turbines without a usable source project name are not grouped.
Interactive wind farm map
Pan and zoom to load groups within the visible area. Markers are approximate average turbine positions, not surveyed project centres.
Loading map…
Browse wind farm groups
| Source project name | Location | Turbines | Known rated MW | Years in source |
|---|---|---|---|---|
| Milford Phase I | Beaver County, Utah | 97 | 203.50 | 2009 |
| Milford Phase II | Millard County, Utah | 59 | 88.50 | 2011 |
| Latigo | San Juan County, Utah | 27 | 62.10 | 2016 |
| Milford Phase II | Beaver County, Utah | 9 | 13.50 | 2011 |
| Spanish Fork | Utah County, Utah | 9 | 18.90 | 2008 |
| unknown Utah County | Utah County, Utah | 3 | Unknown | 2015 |
| Camp Williams | Utah County, Utah | 2 | 0.89 | 2000–2005 |
| Shakopee Mdewakanton Sioux | Tooele County, Utah | 1 | 1.50 | 2009 |
| Tooele Army Depot II | Tooele County, Utah | 1 | 1.79 | 2016 |
Data interpretation: The same source project name may describe more than one development phase; projects may span counties, and differently named records may refer to the same development. Do not use the group count as an authoritative number of wind farms. No current operational status, owner, permit or grid connection is inferred.