United States / Wind turbines / Wind farm groups
US wind farm directory
Explore turbines grouped by the project name, state and county supplied by the US Wind Turbine Database. These are provisional source-name groups, not verified distinct wind farms or planning boundaries.
2,092Source-name groups
77,839Turbines in these groups
159,586.8 MWSum of known turbine ratings (72,783 turbines)
Source: USWTDB_V9_1_20260928. Capacity is a sum of known individual turbine ratings, not independently verified project capacity. Turbines without a usable source project name are not grouped.
Interactive wind farm map
Pan and zoom to load groups within the visible area. Markers are approximate average turbine positions, not surveyed project centres.
Loading mapβ¦
Browse wind farm groups
| Source project name | Location | Turbines | Known rated MW | Years in source |
|---|---|---|---|---|
| Chevelon Butte Wind Phase I | Navajo County, Arizona | 4 | 18.00 | 2023 |
| Cisco | Jackson County, Minnesota | 4 | 8.40 | 2008 |
| Clearwater Wind III | Garfield County, Montana | 4 | 10.90 | 2024 |
| Creston Ridge | Platte County, Nebraska | 4 | 6.80 | 2015 |
| Emmonak 1 | Kusilvak, Alaska | 4 | 0.40 | 2011 |
| Future Generation Wind | Plymouth County, Massachusetts | 4 | 8.00 | 2016 |
| Great Prairie Wind 2 | Sherman County, Texas | 4 | 11.28 | 2022 |
| Green River | Whiteside County, Illinois | 4 | 10.50 | 2019 |
| Hopkins Ridge II | Columbia County, Washington | 4 | 7.20 | 2008 |
| Huerfano River | Huerfano County, Colorado | 4 | 8.00 | 2013 |
| Inadale (Roscoe IV) | Scurry County, Texas | 4 | 4.00 | 2009 |
| Lamar Municipal | Prowers County, Colorado | 4 | 6.00 | 2004 |
| Loess Hills Wind Project | Atchison County, Missouri | 4 | 5.00 | 2008 |
| MinWind I & II | Rock County, Minnesota | 4 | 3.80 | 2002 |
| Mountaineer Wind Energy Center (Thomas) | Preston County, West Virginia | 4 | 6.00 | 2002 |
| Munnsville | Oneida County, New York | 4 | 6.00 | 2007 |
| Roscoe | Scurry County, Texas | 4 | 4.00 | 2008 |
| Roxwind | Oxford County, Maine | 4 | 15.20 | 2021 |
| Sand Bluff | Sterling County, Texas | 4 | 8.00 | 2007 |
| Sandy Ridge 2 | Centre County, Pennsylvania | 4 | 24.00 | 2023 |
| Selawik Wind Project | Northwest Arctic Borough, Alaska | 4 | 0.26 | 2004 |
| Sendero | Zapata County, Texas | 4 | 8.00 | 2015 |
| Skeleton Creek | Major County, Oklahoma | 4 | 11.28 | 2020 |
| Southern Hills Expansion | Adair County, Iowa | 4 | 8.80 | 2020 |
| unknown Adair County | Adair County, Iowa | 4 | Unknown | 2020 |
| unknown Boone County | Boone County, Iowa | 4 | Unknown | 2022 |
| unknown Saline County | Saline County, Nebraska | 4 | Unknown | 2021 |
| unknown Sandusky County | Sandusky County, Ohio | 4 | 0.10 | 2023 |
| Woodstock Hills Repower | Pipestone County, Minnesota | 4 | 9.20 | 2018 |
| 251 Wind | Kern County, California | 3 | 0.29 | 1987 |
Data interpretation: The same source project name may describe more than one development phase; projects may span counties, and differently named records may refer to the same development. Do not use the group count as an authoritative number of wind farms. No current operational status, owner, permit or grid connection is inferred.