United States βΊ Power plants βΊ Wind farms βΊ New York
OCTARY USA Β· WIND FARMSCancelled wind farms in New York
Every US wind farm of 1 MW or more, onshore and offshore, from planning to retirement. Click a state to drill down, or search near a place.
Operating34plants
Operating capacity2,981 MWnameplate
Under construction2,081 MW4 plants
Whole pipeline2,584 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
11 plants
| Plant | Capacity | Stage |
|---|---|---|
| Canisteo Wind Farm | 291 MW | Withdrawn / abandoned |
| Ecogen Wind | 272 MW | Withdrawn / abandoned |
| Jordanville Wind Farm | 80.0 MW | Withdrawn / abandoned |
| Watkins Glen Wind Energy Center | 80.0 MW | Withdrawn / abandoned |
| Alabama Ledge Wind Farm LLC | 79.8 MW | Withdrawn / abandoned |
| Ripley Westfield Wind LLC | 75.0 MW | Withdrawn / abandoned |
| Allegany Wind Farm | 72.5 MW | Withdrawn / abandoned |
| North Slope, LLC | 50.0 MW | Withdrawn / abandoned |
| Noble Bellmont Windpark LLC | 21.0 MW | Withdrawn / abandoned |
| Black Oak Wind Farm | 16.1 MW | Withdrawn / abandoned |
| Cody Road Wind Farm | 4.8 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Pattern Operators LP2 plants Β· 347 MW
- Invenergy Services LLC1 plants Β· 291 MW
- Avangrid Power LLC1 plants Β· 80.0 MW
- Watkins Glen Wind LLC1 plants Β· 80.0 MW
- Alabama Ledge Wind Farm LLC1 plants Β· 79.8 MW
- Big Sky Wind, LLC1 plants Β· 72.5 MW
- North Slope LLC1 plants Β· 50.0 MW
- Noble Wind Operations LLC1 plants Β· 21.0 MW
- Black Oak Wind Farm LLC1 plants Β· 16.1 MW
- Green Power Energy LLC1 plants Β· 4.8 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map Β· Individual wind turbines (USWTDB)