| Crowned Heron 1 - Storage, LLC |
150 MW 300 MWh |
Operating |
TX Fort Bend |
RWE Americas, LLC |
2026 |
| Crowned Heron 2 - Storage, LLC |
150 MW 300 MWh |
Operating |
TX Fort Bend |
RWE Americas, LLC |
2026 |
| Danish Fields Storage |
150 MW 225 MWh |
Operating |
TX Wharton |
Danish Fields Storage, LLC |
2026 |
| Desert Willow Energy Storage |
150 MW 300 MWh |
Operating |
TX Ellis |
Desert Willow Energy Storage |
2025 |
| Headcamp BESS |
150 MW 300 MWh |
Operating |
TX Pecos |
Lydian Energy |
2026 |
| Myrtle Storage |
150 MW 225 MWh |
Operating |
TX Brazoria |
Myrtle Storage, LLC |
2026 |
| Padua 2 |
150 MW 600 MWh |
Operating |
TX Bexar |
Padua 2 |
2026 |
| Revolution |
150 MW 369 MWh |
Operating |
TX Crane |
Crane 2 BESS, LLC |
2023 |
| Roadrunner Crossing Energy Storage |
150 MW 150 MWh |
Operating |
TX Eastland |
Roadrunner Crossing Energy Storage LLC |
2025 |
| Wizard Energy Storage |
150 MW 300 MWh |
Operating |
TX Galveston |
Wizard Energy Storage LLC |
2026 |
| Wolf Tank Storage |
150 MW 150 MWh |
Operating |
TX Webb |
Wolf Tank Storage LLC |
2023 |
| Connolly BESS |
125 MW 250 MWh |
Operating |
TX Wise |
BT Connolly Storage, LLC |
2024 |
| GFTX BESS |
125 MW 250 MWh |
Operating |
TX Travis |
Giga Texas Energy LLC |
2024 |
| Noble Solar |
125 MW 125 MWh |
Operating |
TX Denton |
Geronimo Power |
2022 |
| Project Lynx |
125 MW 250 MWh |
Operating |
TX Nueces |
Project Lynx - Giga Texas Energy |
2026 |
| TE Smith Storage |
125 MW 250 MWh |
Operating |
TX Rockwall |
BT Smith Storage LLC |
2026 |
| Sun Valley Storage |
123 MW 123 MWh |
Operating |
TX Hill |
Sun Valley Storage LLC |
2024 |
| Azure Sky Wind Project, LLC Hybrid |
120 MW 190 MWh |
Operating |
TX Throckmorton |
Azure Sky Wind Project, LLC |
2023 |
| Wigeon Whistle Battery Storage Plant |
120 MW 174 MWh |
Operating |
TX Collin |
Wigeon Whistle BESS LLC |
2024 |
| Bright Arrow Solar, LLC |
104 MW 100 MWh |
Operating |
TX Hopkins |
RWE Americas, LLC |
2025 |
| Fort Duncan BESS |
103 MW 205 MWh |
Operating |
TX Maverick |
Fort Duncan BESS, LLC |
2025 |
| St. Gall Energy Storage I |
103 MW 200 MWh |
Operating |
TX Pecos |
St. Gall Energy Storage I |
2024 |
| Flower Valley II |
101 MW 200 MWh |
Operating |
TX Reeves |
Flower Valley II |
2022 |
| Swoose II |
101 MW 200 MWh |
Operating |
TX Ward |
Swoose II |
2022 |
| Al Pastor Battery Storage Plant |
100 MW 145 MWh |
Operating |
TX Dawson |
Al Pastor BESS LLC |
2024 |
| Ables Springs Solar & Storage |
100 MW 158 MWh |
Operating |
TX Kaufman |
Ables Springs Solar, LLC |
2025 |
| Angelo Storage |
100 MW 249 MWh |
Operating |
TX Tom Green |
Angelo Storage, LLC |
2025 |
| Bat Cave |
100 MW 110 MWh |
Operating |
TX Mason |
Engie North America |
2021 |
| Bexar ESS |
100 MW 100 MWh |
Operating |
TX Bexar |
Bexar ESS, LLC |
2026 |
| Brazos Bend BESS, LLC |
100 MW 100 MWh |
Operating |
TX Fort Bend |
Cypress Creek Renewables |
2024 |
| Burksol Energy Storage |
100 MW 200 MWh |
Operating |
TX Dickens |
Burksol, LLC |
2025 |
| Citrus Flatts Energy Center, LLC |
100 MW 200 MWh |
Operating |
TX Cameron |
East Point Energy, LLC |
2023 |
| Copperhead Solar, LLC |
100 MW 100 MWh |
Operating |
TX McLennan |
Geronimo Power |
2024 |
| Estonian Solar Project, LLC |
100 MW 158 MWh |
Operating |
TX Delta |
Enel Green Power Estonian Solar Project, LLC |
2025 |
| Gambit Energy Storage - Angleton Storage |
100 MW 200 MWh |
Operating |
TX Brazoria |
Gambit Energy Storage LLC |
2021 |
| Great Kiskadee Storage |
100 MW 249 MWh |
Operating |
TX Hidalgo |
Great Kiskadee Storage, LLC |
2025 |
| Ignacio Grid Energy Storage System |
100 MW 100 MWh |
Operating |
TX Hidalgo |
Ignacio Grid, LLC |
2023 |
| Madero Grid |
100 MW 100 MWh |
Operating |
TX Hidalgo |
Madero Grid, LLC |
2023 |
| North Fork TX |
100 MW 110 MWh |
Operating |
TX Williamson |
Engie North America |
2021 |
| Seven Flags BESS LLC |
100 MW 200 MWh |
Operating |
TX Webb |
Seven Flags BESS LLC |
2026 |
| Shamrock Wind |
100 MW 100 MWh |
Operating |
TX Crockett |
Shamrock Wind LLC |
2025 |
| St Gall Energy Storage II |
100 MW 200 MWh |
Operating |
TX Pecos |
St Gall Energy Storage II LLC |
2025 |
| Tierra Seca |
100 MW 200 MWh |
Operating |
TX Val Verde |
Tierra Seca BESS, LLC |
2026 |
| TX10 Hummingbird Storage |
100 MW 227 MWh |
Operating |
TX Denton |
Key Capture Energy |
2024 |
| TX12 Silicon Hill Storage |
100 MW 100 MWh |
Operating |
TX Travis |
Key Capture Energy |
2022 |
| TX15 Limousin Oak Storage |
100 MW 227 MWh |
Operating |
TX Grimes |
Key Capture Energy |
2024 |
| Carambola BESS |
98.4 MW 197 MWh |
Operating |
TX Hidalgo |
Carambola BESS LLC |
2026 |
| Azure Sky Solar |
91.2 MW 81 MWh |
Operating |
TX Haskell |
Azure Sky Solar Project, LLC |
2022 |
| Big Star Solar, LLC (Hybrid) |
80.0 MW 80 MWh |
Operating |
TX Bastrop |
RWE Americas, LLC |
2026 |
| Gaia Hybrid |
76.8 MW 307 MWh |
Operating |
TX Navarro |
Sunraycer Assets I LLC |
2026 |