United States βΊ Power plants βΊ Battery storage βΊ Massachusetts
OCTARY USA Β· BATTERY STORAGEAES Distributed Energy: battery storage sites in Massachusetts
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating21plants
Operating capacity50.9 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
21 plants
| Plant | Capacity | Stage |
|---|---|---|
| Dunstable Solar 1, LLC | 4.5 MW 20 MWh |
|
| Ryan Road Solar LLC Hybrid(CSG) | 4.3 MW 14 MWh |
|
| BWC Lake Lashaway, LLC Hybrid | 3.7 MW 9 MWh |
|
| West Haydenville PJ Community Solar | 3.6 MW 8 MWh |
|
| Annese Solar Project Hybrid CSG | 3.5 MW 7 MWh |
|
| ZPD-PT Solar Project 2017-038 Hybrid LLC | 3.5 MW 7 MWh |
|
| Randall Solar Project Hybrid | 3.3 MW 6 MWh |
|
| Amaterasu LLC | 3.2 MW 6 MWh |
|
| Brookwood Drive Community Solar | 3.0 MW 8 MWh |
|
| McDougle-Mitchell Solar Project Hybrid C | 2.9 MW 6 MWh |
|
| ZPD-PT Solar Project 2017-006 LLC Hybrid | 2.5 MW 5 MWh |
|
| ZPD-PT Solar Project 2017-023 LLC Hybrid | 1.9 MW 4 MWh |
|
| West A&B Solar Project Hybrid CSG | 1.8 MW 4 MWh |
|
| Alicea Solar Project Hybrid CSG | 1.5 MW 3 MWh |
|
| Cronin Road Solar 1, LLC CSG Hybrid | 1.5 MW 8 MWh |
|
| Cycz Solar Project CSG Hybrid | 1.3 MW 3 MWh |
|
| Hurteau Solar Project Hybrid | 1.3 MW 2 MWh |
|
| Partridge Hill Solar Hybrid | 1.3 MW 2 MWh |
|
| BWC Muddy Brook, LLC Hybrid | 0.9 MW 2 MWh |
|
| BWC Stony Brook, LLC Hybrid | 0.7 MW 1 MWh |
|
| ZPD-PT Solar Project 2017-021 LLC Hybrid | 0.7 MW 3 MWh |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Medway Grid LLC1 plants Β· 250 MW
- Energizar Storage LLC1 plants Β· 250 MW
- FE Taft LLC1 plants Β· 200 MW
- Somerset Energy Storage, LLC1 plants Β· 168 MW
- Cranberry Point Energy Storage LLC1 plants Β· 150 MW
- AES Distributed Energy21 plants Β· 50.9 MW
- Agilitas Energy, Inc.11 plants Β· 41.1 MW
- Eversource1 plants Β· 25.0 MW
- SoCore Energy LLC5 plants Β· 14.8 MW
- Madison Energy Investments LLC9 plants Β· 11.0 MW
- Uriel Renovables S.A2 plants Β· 10.0 MW
- Kearsarge Riverpark I LLC2 plants Β· 10.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map