πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Alabama

OCTARY USA Β· SOLAR FARMS

Operating solar farms in Alabama

Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating15plants
Operating capacity986 MWnameplate
Under construction80.0 MW1 plants
Whole pipeline1,071 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

15 plants
PlantCapacityStageStateOwner / operatorYear
Muscle Shoals 227 MW Operating AL
Colbert
Muscle Shoals Solar, LLC 2021
Black Bear Solar 1 100 MW Operating AL
Montgomery
Lightsource Renewable Energy Asset Management, LLC 2023
East Atmore Solar 80.0 MW Operating AL
Escambia
Nofar USA Energy Investments and Management, LLC 2025
Old Hayneville Solar, LLC 80.0 MW Operating AL
Montgomery
Modal Power LLC 2026
Walker Springs I 80.0 MW Operating AL
Clarke
Origis Energy USA, Inc 2026
Walker Springs II 80.0 MW Operating AL
Clarke
Origis Energy USA, Inc 2026
Wing 80.0 MW Operating AL
Covington
Origis Energy USA, Inc 2023
LaFayette Solar Farm 79.2 MW Operating AL
Chambers
Boralex US Operations LLC 2017
River Bend Solar, LLC (AL) 75.0 MW Operating AL
Lauderdale
River Bend Solar, LLC 2016
TAI Huntsville Solar Hybrid 32.4 MW Operating AL
Madison
TAI Huntsville Solar, LLC 2024
Fort Benning Solar Facility 30.0 MW Operating AL
Russell
Georgia Power Co 2015
Cumblerland Land Holdings, LLC 14.7 MW Operating AL
Limestone
Cumberland Land Holdings, LLC 2018
Fort Rucker Solar Array 10.6 MW Operating AL
Dale
Alabama Power Co 2017
Redstone Arsenal Hybrid 10.0 MW Operating AL
Madison
MN8 Energy LLC 2017
ANAD Solar Array 7.4 MW Operating AL
Calhoun
Alabama Power Co 2017

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map