United States › Power plants › Solar farms › Nevada
OCTARY USA · SOLAR FARMSOperating solar farms in Nevada — page 2
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating70plants
Operating capacity5,480 MWnameplate
Under construction1,428 MW6 plants
Whole pipeline3,726 MWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
70 plants · page 2 of 2
| Plant | Capacity | Stage |
|---|---|---|
| Brady | 8.0 MW | |
| Tesla Reno GigaFactory | 6.7 MW | |
| Beowawe | 5.8 MW | |
| Steamboat Hills LP | 5.6 MW | |
| North Valley | 5.5 MW | |
| Steamboat II | 5.5 MW | |
| Steamboat III | 5.5 MW | |
| Solar Las Vegas MB-1 | 4.9 MW | |
| Las Vegas WPCF Solar Plant | 3.3 MW | |
| Galena 2 Geothermal Power Plant | 3.0 MW | |
| NV - Nokomis - CHI | 3.0 MW | |
| Dignity - San Martin | 1.7 MW | |
| Solar Las Vegas MB 2, LLC | 1.5 MW | |
| Dignity - Siena Campus | 1.4 MW | |
| IGS LAS1 | 1.0 MW | |
| IGS VGT | 1.0 MW | |
| IKEA Las Vegas 462 | 1.0 MW | |
| Speedway North Bldg 1-sllas701 | 1.0 MW | |
| TJX Las Vegas | 1.0 MW | |
| Western 102 Power Plant | 1.0 MW |
Page 2 of 2
← Previous
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- RWE Americas, LLC7 plants · 914 MW
- Gemini Solar1 plants · 690 MW
- 325MK 8me LLC1 plants · 300 MW
- Silver State Solar Power South, LLC1 plants · 260 MW
- Arevon Energy, Inc.1 plants · 250 MW
- Nevada Gold Energy, LLC1 plants · 200 MW
- Dodge Flat Solar, LLC1 plants · 200 MW
- Arrow Canyon Solar LLC1 plants · 200 MW
- Techren Solar II LLC1 plants · 200 MW
- Escape Solar LLC1 plants · 185 MW
- Townsite Solar, LLC1 plants · 180 MW
- EDF Renewable Asset Holdings, Inc.2 plants · 179 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map