United States › Power plants › Solar farms
OCTARY USA · SOLAR FARMSCancelled solar farms in the USA — page 10
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating7,669plants
Operating capacity172.0 GWnameplate
Under construction46.7 GW601 plants
Whole pipeline122.2 GWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
507 plants · page 10 of 11
| Plant | Capacity | Stage |
|---|---|---|
| Wallace Solar 2 | 1.9 MW | Withdrawn / abandoned |
| Peanut Farm | 1.8 MW | Withdrawn / abandoned |
| Mountain Lion Solar | 1.7 MW | Withdrawn / abandoned |
| TX LaPort 10060 Porter Road Solar | 1.6 MW | Withdrawn / abandoned |
| Con Dios Solar 11 | 1.5 MW | Withdrawn / abandoned |
| Con Dios Solar 3 | 1.5 MW | Withdrawn / abandoned |
| Helen Solar 1 | 1.5 MW | Withdrawn / abandoned |
| Helen Solar 2 | 1.5 MW | Withdrawn / abandoned |
| Lake Perris Solar | 1.5 MW | Withdrawn / abandoned |
| Neenach Solar Center | 1.5 MW | Withdrawn / abandoned |
| Onslow Energy | 1.5 MW | Withdrawn / abandoned |
| San Jacinto Solar | 1.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #04 | 1.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #14 | 1.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #30 | 1.5 MW | Withdrawn / abandoned |
| SunE Redlands | 1.5 MW | Withdrawn / abandoned |
| Zuni Solar 1 | 1.5 MW | Withdrawn / abandoned |
| Zuni Solar 2 | 1.5 MW | Withdrawn / abandoned |
| Elwood 1-SLCHI901 | 1.3 MW | Withdrawn / abandoned |
| IL - SMHEC - Moraine Valley | 1.3 MW | Withdrawn / abandoned |
| CA Moss Landing 3040 Hilltop Rd | 1.2 MW | Withdrawn / abandoned |
| Madison Solar 1 LLC | 1.2 MW | Withdrawn / abandoned |
| Pettinos Solar | 1.2 MW | Withdrawn / abandoned |
| Wildomar Solar | 1.2 MW | Withdrawn / abandoned |
| Bensenville Ind Park 12-SLCHI412 | 1.1 MW | Withdrawn / abandoned |
| Bensenville Ind Park 6-SLCHI406 | 1.1 MW | Withdrawn / abandoned |
| Foothill Solar Project | 1.1 MW | Withdrawn / abandoned |
| Ironwood State Prison | 1.1 MW | Withdrawn / abandoned |
| LATTC South Campus Solar | 1.1 MW | Withdrawn / abandoned |
| Atlantic Solar | 1.0 MW | Withdrawn / abandoned |
| Austin TX GigaFactory | 1.0 MW | Withdrawn / abandoned |
| Dadswell Solar | 1.0 MW | Withdrawn / abandoned |
| Gladiolus Solar, LLC | 1.0 MW | Withdrawn / abandoned |
| Hydra Community Solar | 1.0 MW | Withdrawn / abandoned |
| Los Alamos PV Site | 1.0 MW | Withdrawn / abandoned |
| Mazeppa CSG | 1.0 MW | Withdrawn / abandoned |
| Meriden Solar One | 1.0 MW | Withdrawn / abandoned |
| Novel Holmquist Solar CSG | 1.0 MW | Withdrawn / abandoned |
| Novel Loren Solar LLC CSG | 1.0 MW | Withdrawn / abandoned |
| Snowdrop Solar, LLC | 1.0 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #27 | 1.0 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #31 | 1.0 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #47 | 1.0 MW | Withdrawn / abandoned |
| TC Solar RCE | 1.0 MW | Withdrawn / abandoned |
| USS Grandpa Solar | 1.0 MW | Withdrawn / abandoned |
| USS Zanzibar Solar LLC CSG | 1.0 MW | Withdrawn / abandoned |
| Winton Solar 2 | 1.0 MW | Withdrawn / abandoned |
| NJ TRANSITGRID | 0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #08 | 0.5 MW | Withdrawn / abandoned |
| Solar Photovoltaic Project #09 | 0.5 MW | Withdrawn / abandoned |
Page 10 of 11
← Previous Next →
Operating capacity by state
Click a state to drill down.
AK8MWME968MWVT156MWNH8MWWA348MWID827MWMT181MWND–MN2.2GWIL5.9GWWI2.6GWMI3.3GWNY3.2GWRI452MWMA1.5GWOR1.5GWNV5.5GWWY242MWSD217MWIA701MWIN5.3GWOH5GWPA1.2GWNJ1.3GWCT502MWCA26GWUT3.5GWCO3.4GWNE160MWMO1.9GWKY1.4GWWV259MWVA5.3GWMD1.4GWDE139MWAZ9.1GWNM3.3GWKS434MWAR2.8GWTN1.2GWNC7.1GWSC2GWDC35MWOK1.2GWLA1.6GWMS1.7GWAL986MWGA5.5GWHI578MWTX35GWFL13GW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Solar Proponent LLC6 plants · 3,040 MW
- Naturgy Candela DevCo LLC1 plants · 2,250 MW
- Leeward Asset Management, LLC7 plants · 1,244 MW
- Alpin Holding LLC8 plants · 1,060 MW
- Lightsource Renewable Energy Asset Management, LLC12 plants · 1,054 MW
- NextEra Blythe Solar Energy Center, LLC1 plants · 797 MW
- MS11 plants · 756 MW
- Cypress Creek Renewables11 plants · 677 MW
- Nevada Power Co2 plants · 600 MW
- Sonoran West Solar Holdings LLC1 plants · 540 MW
- 210MS 8me, LLC1 plants · 400 MW
- Imperial Valley Solar, LLC1 plants · 400 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map