United States βΊ Power plants βΊ Solar farms βΊ Oregon
OCTARY USA Β· SOLAR FARMSSolRiver Capital LLC: solar farms in Oregon
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating6plants
Operating capacity18.7 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline2.5 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
7 plants
| Plant | Capacity | Stage |
|---|---|---|
| Butler Solar, LLC | 4.0 MW | |
| Sheridan Solar LLC (CSG) | 3.0 MW | |
| Wallace Solar LLC (CSG) | 3.0 MW | |
| Auburn Solar LLC (CSG) | 2.9 MW | |
| Green Solar LLC (CSG) | 2.9 MW | |
| Marble Solar LLC (CSG) | 2.9 MW | |
| Canyonville Solar LLC (CSG) | 2.5 MW | In planning |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Sunstone Solar, LLC1 plants Β· 1,200 MW
- DECH bn, LLC1 plants Β· 1,000 MW
- Cedar Island Solar LLC1 plants Β· 800 MW
- Avangrid Power LLC8 plants Β· 704 MW
- Obsidian Solar Center LLC1 plants Β· 400 MW
- Nolin Hills Wind, LLC1 plants Β· 300 MW
- BrightNight Power1 plants Β· 247 MW
- Invenergy Services LLC3 plants Β· 166 MW
- Wheatridge Optimization II, LLC1 plants Β· 130 MW
- BIGL bn, LLC1 plants Β· 125 MW
- Wheatridge Optimization I, LLC1 plants Β· 110 MW
- SunStrong Management17 plants Β· 66.4 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map