United States βΊ Power plants βΊ Solar farms βΊ Kansas
OCTARY USA Β· SOLAR FARMSToday's Power, Inc.: solar farms in Kansas
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating19plants
Operating capacity20.0 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
19 plants
| Plant | Capacity | Stage |
|---|---|---|
| CMS-Coldwater | 2.0 MW | |
| Americus | 1.0 MW | |
| BP-Kanza | 1.0 MW | |
| Caney Valley | 1.0 MW | |
| Cheney Solar | 1.0 MW | |
| DeGraff Butler Electric | 1.0 MW | |
| Greenbush-Heartland | 1.0 MW | |
| Greensburg Solar | 1.0 MW | |
| Harvey County | 1.0 MW | |
| Huntsville-Ark Valley, KS | 1.0 MW | |
| Lindsborg | 1.0 MW | |
| Maize | 1.0 MW | |
| Mound | 1.0 MW | |
| Munson-DS&O | 1.0 MW | |
| Oskaloosa | 1.0 MW | |
| Solomon-DS&O | 1.0 MW | |
| St. George | 1.0 MW | |
| Studebaker | 1.0 MW | |
| Urbana-Heartland | 1.0 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Nextera Energy Resources1 plants Β· 202 MW
- Public Service Co of Oklahoma1 plants Β· 189 MW
- Boot Hill Solar LLC1 plants Β· 150 MW
- Evergy Missouri West1 plants Β· 65.0 MW
- Sunflower Electric Power Corp1 plants Β· 20.4 MW
- Today's Power, Inc.19 plants Β· 20.0 MW
- Lightsource Renewable Energy Asset Management, LLC1 plants Β· 20.0 MW
- Evergy Kansas Central, Inc6 plants Β· 16.6 MW
- Kenyon Energy KS Solar 1 LLC1 plants Β· 6.0 MW
- Onyx Asset Services Group3 plants Β· 4.4 MW
- PPM Solar LLC2 plants Β· 4.0 MW
- Kansas Electric Power Coop Inc1 plants Β· 1.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map