πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms β€Ί Oregon

OCTARY USA Β· SOLAR FARMS

Adapture Renewables, Inc.: solar farms in Oregon

Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating15plants
Operating capacity54.0 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

15 plants
PlantCapacityStageStateOwner / operatorYear
Baker City Solar 15.0 MW Operating OR
Baker
Adapture Renewables, Inc. 2020
SulusSolar17 3.1 MW Operating OR
Clackamas
Adapture Renewables, Inc. 2020
BristolSolar 3.0 MW Operating OR
Marion
Adapture Renewables, Inc. 2021
MilfordSolar OR 3.0 MW Operating OR
Washington
Adapture Renewables, Inc. 2021
Morgan Solar Center 3.0 MW Operating OR
Malheur
Adapture Renewables, Inc. 2020
Ontario Solar Center 3.0 MW Operating OR
Malheur
Adapture Renewables, Inc. 2020
SulusSolar22 3.0 MW Operating OR
Marion
Adapture Renewables, Inc. 2021
SulusSolar28 3.0 MW Operating OR
Yamhill
Adapture Renewables, Inc. 2020
SulusSolar33 3.0 MW Operating OR
Yamhill
Adapture Renewables, Inc. 2021
SulusSolar35 3.0 MW Operating OR
Clackamas
Adapture Renewables, Inc. 2020
Vale Solar Center 3.0 MW Operating OR
Malheur
Adapture Renewables, Inc. 2020
Brush Solar Center 2.8 MW Operating OR
Baker
Adapture Renewables, Inc. 2020
SulusSolar29 2.6 MW Operating OR
Clackamas
Adapture Renewables, Inc. 2020
SulusSolar25 2.2 MW Operating OR
Marion
Adapture Renewables, Inc. 2020
GreenparkSolar 1.3 MW Operating OR
Marion
Adapture Renewables, Inc. 2020

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map