United States › Power plants › Gas power plants › Indiana

GAS POWER PLANTS

NA 1 (IN)

NA 1 (IN) is a 3,685 MW cancelled gas power plant in NOT IN FILE County, Indiana, operated by Duke Energy Indiana, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

More gas power plants in Indiana

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
8Natural Gas Fired Combustion Turbine552 MW Cancelled or postponed
1Natural Gas Fired Combustion Turbine318 MW Cancelled or postponed
9Natural Gas Fired Combustion Turbine259 MW Cancelled or postponed
10Natural Gas Fired Combustion Turbine259 MW Cancelled or postponed
11Natural Gas Fired Combustion Turbine259 MW Cancelled or postponed
12Natural Gas Fired Combustion Turbine239 MW Cancelled or postponed
13Natural Gas Fired Combustion Turbine239 MW Cancelled or postponed
14Natural Gas Fired Combustion Turbine239 MW Cancelled or postponed
15Natural Gas Fired Combustion Turbine239 MW Cancelled or postponed
16Natural Gas Fired Combustion Turbine239 MW Cancelled or postponed
5Natural Gas Fired Combustion Turbine185 MW Cancelled or postponed
6Natural Gas Fired Combustion Turbine185 MW Cancelled or postponed
7Natural Gas Fired Combustion Turbine185 MW Cancelled or postponed
2Natural Gas Fired Combustion Turbine96 MW Cancelled or postponed
3Natural Gas Fired Combustion Turbine96 MW Cancelled or postponed
4Natural Gas Fired Combustion Turbine96 MW Cancelled or postponed

Plant details

Operator
Duke Energy Indiana, LLC
Location
NOT IN FILE County, Indiana
Sector
Electric Utility
Capacity
Cancelled: 3,685 MW
EIA plant ID
7228

Location

No coordinates reported for this plant.

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem