SOLAR FARMS · BATTERY STORAGEHighland Solar I, LLC - (CO)
Highland Solar I, LLC - (CO) is a 400 MW planned solar and battery storage plant in Pueblo County, Colorado, operated by Highland Solar I, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| HLS01 | Solar Photovoltaic | 300 MW | Regulatory approvals pending |
| HES01 | Batteries | 100 MW | Regulatory approvals pending |
Plant details
- Operator
- Highland Solar I, LLC
- Location
- Pueblo County, Colorado
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 400 MW
- EIA plant ID
- 70583
Location
38.4196, -104.2277
Nearby power plants
- Neptune Energy Center HybridSolar farms, Battery storage · 450 MW · 11.8 mi
- Pueblo Airport Generating StationGas power plants, Battery storage · 490 MW · 17.6 mi
- Trane PuebloSolar farms · 1.4 MW · 18.3 mi
- Thunder Wolf Energy Center HybridSolar farms, Battery storage · 348 MW · 18.4 mi
- CEC Solar #1117, LLCSolar farms · 1.5 MW · 18.6 mi
- Airport IndustrialOil-fired power plants · 10.0 MW · 18.9 mi
- USS Giveback Solar LLC (CSG)Solar farms · 2.0 MW · 19.1 mi
- Waxwing Solar CSGSolar farms · 3.0 MW · 19.5 mi
- CSU PuebloSolar farms · 1.0 MW · 20.6 mi
- Mirasol Energy Center, LLC.Solar farms · 400 MW · 21.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem