United States βΊ Power plants βΊ Gas power plants βΊ Texas
GAS POWER PLANTSWT2
WT2 is a 10.0 MW under construction gas power plant in Winkler County, Texas, operated by ET Genco LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget May 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: May 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| WT2-1 | Natural Gas Fired Combustion Turbine | 10 MW | Built, awaiting commercial operation |
Plant details
- Operator
- ET Genco LLC
- Location
- Winkler County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 10.0 MW
- EIA plant ID
- 70561
Location
31.8361, -103.3050
Nearby power plants
- Grey WolfGas power plants Β· 10.0 MW Β· 5.0 mi
- LonestarBattery storage Β· 9.9 MW Β· 17.0 mi
- Rattlesnake (TX)Battery storage Β· 9.9 MW Β· 19.0 mi
- Tip Top Solar Energy Center LLCSolar farms Β· 220 MW Β· 20.6 mi
- SPS1 DollarhideSolar farms Β· 10.0 MW Β· 22.4 mi
- Cedarvale GasGas power plants Β· 10.0 MW Β· 23.8 mi
- Cedarville (TX)Battery storage Β· 9.9 MW Β· 23.9 mi
- SPS2 JalSolar farms Β· 10.0 MW Β· 25.0 mi
- CPV Basin Ranch Energy CenterGas power plants Β· 1,445 MW Β· 25.2 mi
- Phoebe SolarSolar farms Β· 250 MW Β· 25.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem