United States › Power plants › Battery storage › Virginia
BATTERY STORAGEMeadow Creek VA BESS 1
Meadow Creek VA BESS 1 is a 4.0 MW under construction battery storage site in Craig County, Virginia, operated by Meadow Creek VA BESS 1 LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 9014 | Batteries | 4.0 MW | Under construction (over 50%) |
Plant details
- Operator
- Meadow Creek VA BESS 1 LLC
- Location
- Craig County, Virginia
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 4.0 MW
- EIA plant ID
- 70550
Location
37.4897, -80.1189
Nearby power plants
- Salem Electric DepartmentOil-fired power plants · 1.3 MW · 14.1 mi
- Salem Water PlantOil-fired power plants · 2.0 MW · 14.2 mi
- Salem VA BESS 1Battery storage · 4.0 MW · 14.7 mi
- Salem Street DeptOil-fired power plants · 1.8 MW · 15.1 mi
- NiagaraHydroelectric plants · 3.6 MW · 21.0 mi
- Covington FacilityBioenergy plants, Coal power plants · 161 MW · 22.5 mi
- Low MoorOil-fired power plants · 82.8 MW · 23.4 mi
- Virginia Tech Power PlantGas power plants · 6.3 MW · 24.3 mi
- Rocky Forge WindWind farms · 78.0 MW · 26.7 mi
- Radford Army Ammunition PlantGas power plants · 18.0 MW · 31.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem