United States › Power plants › Battery storage › New York
BATTERY STORAGEBlue Aster Clean Energy LLC
Blue Aster Clean Energy LLC is a 4.9 MW under construction battery storage site in Kings County, New York, operated by NineDot Holdings, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Aug 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Aug 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ND030 | Batteries | 4.9 MW | Under construction (up to 50%) |
Plant details
- Operator
- NineDot Holdings, LLC
- Location
- Kings County, New York
- Balancing authority
- NYIS
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 4.9 MW
- EIA plant ID
- 70308
Location
40.6741, -73.9010
Nearby power plants
- Interfaith Medical CenterOil-fired power plants · 1.2 MW · 1.9 mi
- The Bank of New YorkOil-fired power plants · 7.2 MW · 2.0 mi
- Kingsbrook Jewish Medical CenterOil-fired power plants · 2.6 MW · 2.0 mi
- Wyckoff Heights Medical CenterOil-fired power plants · 2.1 MW · 2.2 mi
- NHH003 Clarkson Fuel CellGas power plants · 1.1 MW · 2.5 mi
- SDM000 Clarkson Fuel CellGas power plants · 1.8 MW · 2.6 mi
- NHH004 Winthrop Fuel CellGas power plants · 1.0 MW · 2.7 mi
- Woodhull HospitalOil-fired power plants · 8.0 MW · 3.0 mi
- 98th Street Battery Storage StationBattery storage · 2.0 MW · 3.2 mi
- NewYork-Presbyterian Brooklyn MethodistOil-fired power plants · 5.9 MW · 4.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem