United States › Power plants › Solar farms › North Carolina
SOLAR FARMSTanglewood Solar, LLC
Tanglewood Solar, LLC is a 8.4 MW under construction solar farm in Pasquotank County, North Carolina, operated by Headwater Energy, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Oct 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 23 | Solar Photovoltaic | 8.4 MW | Under construction (up to 50%) |
Plant details
- Operator
- Headwater Energy, LLC
- Location
- Pasquotank County, North Carolina
- Balancing authority
- CPLE
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 8.4 MW
- EIA plant ID
- 70305
Location
36.2500, -76.3000
Nearby power plants
- PasquotankSolar farms · 20.0 MW · 1.1 mi
- Barnhill Road Solar, LLCSolar farms · 3.1 MW · 1.3 mi
- Tanglewood BESSBattery storage · 3.9 MW · 1.5 mi
- Desert Wind Farm, LLCWind farms · 208 MW · 7.9 mi
- Two Mile Desert ProjectSolar farms · 16.2 MW · 9.2 mi
- Two Mile SolarSolar farms · 5.0 MW · 9.2 mi
- Camden Solar LLCSolar farms · 20.0 MW · 9.5 mi
- Camden Dam Solar, LLCSolar farms · 5.0 MW · 10.6 mi
- GKS SolarSolar farms · 5.0 MW · 11.3 mi
- Sun Farm V, LLCSolar farms · 5.0 MW · 12.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem