Tanglewood Solar, LLC

Tanglewood Solar, LLC is a 8.4 MW under construction solar farm in Pasquotank County, North Carolina, operated by Headwater Energy, LLC.

Plant statusUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingTarget Oct 2026 (not yet reached)
  5. Closed (not yet reached)

Planned start of operation reported to EIA: Oct 2026.

Open in Google MapsMore solar farms in North Carolina

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
23Solar Photovoltaic8.4 MW Under construction (up to 50%)Target Oct 2026

Plant details

Operator
Headwater Energy, LLC
Location
Pasquotank County, North Carolina
Balancing authority
CPLE
Sector
IPP Non-CHP
Capacity
Under construction: 8.4 MW
EIA plant ID
70305