United States › Power plants › Gas power plants › New Mexico
GAS POWER PLANTSWestside - (NM)
Westside - (NM) is a 60.0 MW under construction gas power plant in San Juan County, New Mexico, operated by Saddle Butte Energy Farmington, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Mar 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Mar 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| WS02 | Natural Gas Internal Combustion Engine | 24 MW | Under construction (up to 50%) |
| WS03 | Natural Gas Internal Combustion Engine | 20 MW | Under construction (up to 50%) |
| WS01 | Natural Gas Internal Combustion Engine | 16 MW | Under construction (up to 50%) |
Plant details
- Operator
- Saddle Butte Energy Farmington, LLC
- Location
- San Juan County, New Mexico
- Balancing authority
- SWPP
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 60.0 MW
- EIA plant ID
- 70261
Location
36.7523, -108.3148
Nearby power plants
- Rockmont Solar and Storage ProjectSolar farms, Battery storage · 130 MW · 3.7 mi
- BluffviewGas power plants · 85.8 MW · 6.0 mi
- San Juan Solar ISolar farms, Battery storage · 300 MW · 6.6 mi
- Four Mile Mesa Solar, LLCSolar farms, Battery storage · 200 MW · 8.3 mi
- Foxtail Flats Solar, LLCSolar farms, Battery storage · 250 MW · 8.3 mi
- NTEC Gas PlantGas power plants · 1,089 MW · 8.9 mi
- Four CornersCoal power plants · 1,636 MW · 10.2 mi
- LPEA Sunnyside Solar 1 FacilitySolar farms · 1.7 MW · 35.9 mi
- Navajo DamHydroelectric plants · 30.0 MW · 39.0 mi
- Williams Ignacio Natural Gas PlantOther power plants · 6.1 MW · 39.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem