United States › Power plants › Solar farms › Texas
SOLAR FARMSCantaloupe Solar
Cantaloupe Solar is a 300 MW under construction solar farm in Reeves County, Texas, operated by Cantaloupe Solar - ERCOT.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CANPV | Solar Photovoltaic | 300 MW | Under construction (up to 50%) |
Plant details
- Operator
- Cantaloupe Solar - ERCOT
- Location
- Reeves County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 300 MW
- EIA plant ID
- 70204
Location
31.0567, -103.6634
Nearby power plants
- Matta Power StationBattery storage · 10.0 MW · 1.3 mi
- Toyah Power StationBattery storage · 10.4 MW · 4.0 mi
- FaulknerBattery storage · 9.9 MW · 16.2 mi
- Barilla SolarSolar farms · 30.2 MW · 19.7 mi
- Flower Valley IBattery storage · 9.9 MW · 20.3 mi
- Flower Valley IIBattery storage · 101 MW · 20.3 mi
- TX7 Flat TopBattery storage · 9.9 MW · 20.4 mi
- Saddleback BESS2Other power plants, Battery storage · 19.8 MW · 21.4 mi
- RE RoserockSolar farms · 160 MW · 22.2 mi
- Coyote Springs (TX)Oil-fired power plants, Battery storage · 19.8 MW · 23.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem