United States βΊ Power plants βΊ Solar farms βΊ California
SOLAR FARMSCobalt
Cobalt is a 250 MW under construction solar farm in Riverside County, California, operated by RE Cobalt LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Aug 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Aug 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CBLT | Solar Photovoltaic | 250 MW | Under construction (up to 50%) |
Plant details
- Operator
- RE Cobalt LLC
- Location
- Riverside County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 250 MW
- EIA plant ID
- 70178
Location
33.5710, -118.1789
Nearby power plants
- Alta SeaSolar farms Β· 1.8 MW Β· 11.6 mi
- Marina SouthSolar farms Β· 1.0 MW Β· 11.6 mi
- Port of LA Solar FiT ProjectSolar farms Β· 1.1 MW Β· 12.3 mi
- San Pedro Public Market (SPPM)Solar farms Β· 1.2 MW Β· 12.5 mi
- AES Huntington Beach LLCGas power plants Β· 218 MW Β· 12.5 mi
- AES Huntington Beach Energy ProjectGas power plants Β· 699 MW Β· 12.6 mi
- Long Beach Convention CenterBattery storage Β· 1.5 MW Β· 13.4 mi
- BCE Seal BeachSolar farms, Battery storage Β· 28.7 MW Β· 13.6 mi
- Long Beach GenerationGas power plants Β· 252 MW Β· 13.6 mi
- Catalina ExpressSolar farms Β· 1.0 MW Β· 13.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem