United States › Power plants › Battery storage › Colorado
BATTERY STORAGEDry Land Prairie Energy Storage
Dry Land Prairie Energy Storage is a 250 MW under construction battery storage site in Cheyenne County, Colorado, operated by Dry Land Prairie Energy Storage, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| DL250 | Batteries | 250 MW | Under construction (up to 50%) |
Plant details
- Operator
- Dry Land Prairie Energy Storage, LLC
- Location
- Cheyenne County, Colorado
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 250 MW
- EIA plant ID
- 70137
Location
38.9997, -102.4943
Nearby power plants
- Cheyenne Ridge IIWind farms · 438 MW · 7.3 mi
- Dusty Rose WindWind farms · 502 MW · 9.2 mi
- Cheyenne Ridge Wind FarmWind farms · 498 MW · 15.2 mi
- Crossing Trails Wind Power Project LLC.Wind farms · 104 MW · 17.9 mi
- Singing Grass WindWind farms · 603 MW · 23.9 mi
- Kit Carson WindpowerWind farms · 51.0 MW · 24.6 mi
- Carousel Energy Storage, LLCBattery storage · 150 MW · 25.6 mi
- Burlington (CO)Oil-fired power plants · 129 MW · 28.1 mi
- Bronco Plains Wind II, LLCWind farms · 200 MW · 28.5 mi
- Carousel Wind Farm LLCWind farms · 150 MW · 28.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem