United States › Power plants › Solar farms › Colorado
SOLAR FARMSTrinidad Solar
Trinidad Solar is a 1.8 MW planned solar farm in Las Animas County, Colorado, operated by Clay Creek Energy, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Solar Photovoltaic | 1.8 MW | Regulatory approvals pending |
Plant details
- Operator
- Clay Creek Energy, LLC
- Location
- Las Animas County, Colorado
- Balancing authority
- WACM
- Sector
- IPP Non-CHP
- Capacity
- Planned: 1.8 MW
- EIA plant ID
- 70118
Location
37.1859, -104.4924
Nearby power plants
- Trinidad (CO)Gas power plants, Oil-fired power plants · 9.2 MW · 0.5 mi
- Spanish Peaks SolarSolar farms · 140 MW · 13.3 mi
- Elk RunSolar farms · 200 MW · 18.6 mi
- San Isabel Solar, LLCSolar farms · 30.0 MW · 23.2 mi
- Peak View Wind FarmWind farms · 60.8 MW · 36.3 mi
- Busch Ranch II Wind FarmWind farms · 59.4 MW · 40.3 mi
- Huerfano River WindWind farms · 8.0 MW · 44.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem