United States βΊ Power plants βΊ Solar farms βΊ Colorado
SOLAR FARMSFort Lyon Solar
Fort Lyon Solar is a 1.8 MW planned solar farm in Bent County, Colorado, operated by Clay Creek Energy, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Solar Photovoltaic | 1.8 MW | Regulatory approvals pending |
Plant details
- Operator
- Clay Creek Energy, LLC
- Location
- Bent County, Colorado
- Balancing authority
- WACM
- Sector
- IPP Non-CHP
- Capacity
- Planned: 1.8 MW
- EIA plant ID
- 70115
Location
38.0810, -103.1330
Nearby power plants
- Las AnimasOil-fired power plants Β· 5.6 MW Β· 4.6 mi
- La Junta SolarSolar farms Β· 4.8 MW Β· 21.5 mi
- Deep Space SolarSolar farms Β· 300 MW Β· 23.7 mi
- BH CSG 3Solar farms Β· 1.5 MW Β· 25.0 mi
- Lamar SolarSolar farms Β· 4.8 MW Β· 29.5 mi
- Rocky FordOil-fired power plants Β· 10.0 MW Β· 31.7 mi
- Twin Buttes Wind ProjectWind farms Β· 75.0 MW Β· 31.8 mi
- Lamar PlantWind farms Β· 6.0 MW Β· 32.5 mi
- NSE Camber BH CSG 2, LLCSolar farms Β· 1.5 MW Β· 34.5 mi
- Colorado Green Holdings LLCWind farms Β· 162 MW Β· 38.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem