United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSCharger Solar
Charger Solar is a 394 MW under construction solar farm in Refugio County, Texas, operated by AP Solar 4 LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Oct 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CHPV1 | Solar Photovoltaic | 394 MW | Built, awaiting commercial operation |
Plant details
- Operator
- AP Solar 4 LLC
- Location
- Refugio County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 394 MW
- EIA plant ID
- 69877
Location
28.4167, -97.0352
Nearby power plants
- Seadrift Coke LPOther power plants Β· 7.6 MW Β· 16.1 mi
- BP Chemicals Green Lake PlantOther power plants Β· 38.8 MW Β· 16.2 mi
- Union Carbide Seadrift CogenGas power plants Β· 162 MW Β· 17.3 mi
- Victoria Texas PlantGas power plants Β· 102 MW Β· 18.5 mi
- Tres Port Power, LLCGas power plants Β· 100 MW Β· 20.1 mi
- Victoria Port IIGas power plants Β· 100 MW Β· 20.2 mi
- Coleto CreekCoal power plants Β· 622 MW Β· 23.2 mi
- TX2 Port LavacaBattery storage Β· 9.9 MW Β· 24.4 mi
- Peregrine SolarSolar farms Β· 300 MW Β· 25.5 mi
- Tres City Power LLCGas power plants Β· 100 MW Β· 25.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem