United States › Power plants › Solar farms › Michigan
SOLAR FARMSStrasburg Solar Park
Strasburg Solar Park is a 100 MW under construction solar farm in Monroe County, Michigan, operated by DTE Electric Company.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| STBSP | Solar Photovoltaic | 100 MW | Under construction (up to 50%) |
Plant details
- Operator
- DTE Electric Company
- Location
- Monroe County, Michigan
- Balancing authority
- MISO
- Sector
- Electric Utility
- Capacity
- Under construction: 100 MW
- EIA plant ID
- 69775
Location
41.9719, -83.4598
Nearby power plants
- Monroe (MI)Coal power plants, Oil-fired power plants · 3,293 MW · 8.1 mi
- Sumpter Energy AssociatesBioenergy plants · 11.2 MW · 9.5 mi
- FermiNuclear power plants, Oil-fired power plants · 1,281 MW · 10.4 mi
- SumpterGas power plants · 340 MW · 14.0 mi
- White Tail SolarSolar farms · 140 MW · 14.5 mi
- Temperance Solar, LLCSolar farms · 20.0 MW · 15.5 mi
- French Landing DamHydroelectric plants · 1.6 MW · 16.8 mi
- Slocum Energy StorageBattery storage · 14.0 MW · 17.4 mi
- Trenton Channel Energy CenterBattery storage · 220 MW · 17.6 mi
- Riverview Energy SystemsBioenergy plants · 6.6 MW · 18.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem