United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSTriune Solar
Triune Solar is a 100 MW planned solar farm in Trinity County, Texas, operated by Triune Solar LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2030.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 16777 | Solar Photovoltaic | 100 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Triune Solar LLC
- Location
- Trinity County, Texas
- Balancing authority
- MISO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 100 MW
- EIA plant ID
- 69639
Location
30.9969, -95.1238
Nearby power plants
- Diboll BESSBattery storage Β· 9.9 MW Β· 23.6 mi
- RC Thomas Hydroelectric ProjectHydroelectric plants Β· 26.7 MW Β· 26.1 mi
- Umbriel SolarSolar farms Β· 150 MW Β· 30.4 mi
- Lufkin South BESSBattery storage Β· 9.9 MW Β· 31.2 mi
- Houston County BESSBattery storage Β· 125 MW Β· 31.6 mi
- Azalea Springs Solar ParkSolar farms Β· 180 MW Β· 31.8 mi
- Sun Angel ESSBattery storage Β· 200 MW Β· 36.2 mi
- Piney Woods SolarSolar farms Β· 150 MW Β· 37.7 mi
- Segno Solar StationSolar farms Β· 170 MW Β· 39.0 mi
- San Jacinto County Peaking FacilityGas power plants Β· 170 MW Β· 40.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem