United States › Power plants › Battery storage › Vermont

BATTERY STORAGE

Essex VT BESS 1

Essex VT BESS 1 is a 16.0 MW under construction battery storage site in Chittenden County, Vermont, operated by Essex VT BESS 1 LLC.

Plant statusUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingTarget Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Planned start of operation reported to EIA: Dec 2026.

Open in Google MapsMore battery storage sites in Vermont

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
90918Batteries16 MW Under construction (up to 50%)Target Dec 2026

Plant details

Operator
Essex VT BESS 1 LLC
Location
Chittenden County, Vermont
Balancing authority
ISNE
Sector
IPP Non-CHP
Capacity
Under construction: 16.0 MW
EIA plant ID
69602

Location

44.4837, -73.1072

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem