United States › Power plants › Solar farms › Illinois
SOLAR FARMSTrenton West Phase 2
Trenton West Phase 2 is a 2.0 MW operating solar farm in Clinton County, Illinois, operated by Generate Capital.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 11129 | Solar Photovoltaic | 2.0 MW |
Plant details
- Operator
- Generate Capital
- Location
- Clinton County, Illinois
- Balancing authority
- MISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.0 MW
- First unit online
- Nov 2025
- EIA plant ID
- 69599
Location
38.5824, -89.7001
Nearby power plants
- Trenton WestSolar farms · 2.0 MW · 0.0 mi
- Trenton EastSolar farms · 2.0 MW · 0.5 mi
- Trenton CSG 1 LLCSolar farms · 5.0 MW · 0.8 mi
- Trenton East Phase 2Solar farms · 2.0 MW · 1.3 mi
- St. Clair Solar 5Solar farms · 5.0 MW · 5.9 mi
- BreeseOil-fired power plants · 16.9 MW · 9.6 mi
- Highland Solar 1, LLCSolar farms · 2.0 MW · 10.7 mi
- HighlandOil-fired power plants · 13.6 MW · 11.0 mi
- IMEA HighlandOil-fired power plants · 3.6 MW · 11.0 mi
- Schmidt CSG 1Solar farms · 2.0 MW · 15.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem