United States › Power plants › Battery storage › Massachusetts
BATTERY STORAGEHolyoke MA BESS 1
Holyoke MA BESS 1 is a 5.0 MW under construction battery storage site in Hampden County, Massachusetts, operated by Holyoke MA BESS 1 LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Oct 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Oct 2026.
Open in Google MapsMore battery storage sites in Massachusetts
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 90915 | Batteries | 5.0 MW | Under construction (up to 50%) |
Plant details
- Operator
- Holyoke MA BESS 1 LLC
- Location
- Hampden County, Massachusetts
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 5.0 MW
- EIA plant ID
- 69551
Location
42.1677, -72.6490
Nearby power plants
- DwightHydroelectric plants · 1.2 MW · 2.3 mi
- Holyoke Solar Cooperative at MuellerSolar farms · 2.7 MW · 2.3 mi
- ChemicalHydroelectric plants · 1.6 MW · 2.6 mi
- Chicopee Granby Road SolarSolar farms · 1.6 MW · 2.8 mi
- Cabot HolyokeHydroelectric plants · 2.6 MW · 3.0 mi
- Front StreetOil-fired power plants · 8.1 MW · 3.3 mi
- Riverside HolyokeHydroelectric plants · 6.9 MW · 3.6 mi
- Chicopee SolarSolar farms · 3.0 MW · 3.6 mi
- BoatlockHydroelectric plants · 3.1 MW · 3.7 mi
- Hadley FallsHydroelectric plants · 33.4 MW · 3.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem