United States › Power plants › Solar farms › Oklahoma
SOLAR FARMSHigh Spring Solar Energy
High Spring Solar Energy is a 400 MW planned solar farm in Muskogee County, Oklahoma, operated by High Spring Solar Energy.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| HSS | Solar Photovoltaic | 400 MW | Planned, approvals not yet sought |
Plant details
- Operator
- High Spring Solar Energy
- Location
- Muskogee County, Oklahoma
- Balancing authority
- SWPP
- Sector
- IPP Non-CHP
- Capacity
- Planned: 400 MW
- EIA plant ID
- 69239
Location
35.5767, -95.6582
Nearby power plants
- Georgia-Pacific MuskogeeGas power plants · 114 MW · 23.1 mi
- MuskogeeCoal power plants, Gas power plants · 1,716 MW · 24.4 mi
- Eufaula DamHydroelectric plants · 90.0 MW · 25.2 mi
- Webbers FallsHydroelectric plants · 50.0 MW · 27.4 mi
- Oneta Energy CenterGas power plants · 1,214 MW · 30.1 mi
- Fort GibsonHydroelectric plants · 44.8 MW · 31.5 mi
- WeleetkaGas power plants, Oil-fired power plants · 110 MW · 32.1 mi
- Green Country Power StationGas power plants · 904 MW · 32.1 mi
- Riverside (OK)Gas power plants, Oil-fired power plants · 1,122 MW · 33.6 mi
- Tenkiller FerryHydroelectric plants · 39.0 MW · 34.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem