United States › Power plants › Solar farms › California
SOLAR FARMSSutter Home Winery Westside
Sutter Home Winery Westside is a 2.3 MW operating solar farm in San Joaquin County, California, operated by REC SHW, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SHWST | Solar Photovoltaic | 2.3 MW |
Plant details
- Operator
- REC SHW, LLC
- Location
- San Joaquin County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 2.3 MW
- First unit online
- Oct 2025
- EIA plant ID
- 69039
Location
38.1521, -121.4022
Nearby power plants
- Lodi Energy CenterGas power plants · 289 MW · 4.5 mi
- Combustion Turbine Project No 2Gas power plants · 50.0 MW · 4.5 mi
- LodiGas power plants · 27.4 MW · 5.5 mi
- Enchanted Rock LodiGas power plants · 48.0 MW · 5.6 mi
- SMUD at FleshmanSolar farms · 2.9 MW · 6.9 mi
- Green Acres Solar Facility 1Solar farms · 3.0 MW · 9.6 mi
- Green Acres Solar Facility 2Solar farms · 1.0 MW · 9.6 mi
- SMUD at Van ConettSolar farms · 2.9 MW · 9.7 mi
- RE McKenzie 1 LLCSolar farms · 5.0 MW · 11.9 mi
- RE McKenzie 2 LLCSolar farms · 5.0 MW · 11.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem