United States › Power plants › Battery storage › Arizona

BATTERY STORAGE

Roadrunner Reserve Phase 2

Roadrunner Reserve Phase 2 is a 200 MW operating battery storage site in Pima County, Arizona, operated by Tucson Electric Power Co. Its batteries store up to 800 MWh.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2026 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore battery storage sites in Arizona

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
RDR2Batteries200 MW
800 MWh
OperatingJun 2026

Plant details

Operator
Tucson Electric Power Co
Location
Pima County, Arizona
Balancing authority
TEPC
Sector
Electric Utility
Capacity
Operating: 200 MW
First unit online
Jun 2026
EIA plant ID
68937

Location

32.0730, -110.8210

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem