United States › Power plants › Solar farms › Missouri
SOLAR FARMSBeavertail Solar
Beavertail Solar is a 400 MW under construction solar farm in Henry County, Missouri, operated by Beavertail Solar, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BS | Solar Photovoltaic | 400 MW | Under construction (over 50%) |
Plant details
- Operator
- Beavertail Solar, LLC
- Location
- Henry County, Missouri
- Balancing authority
- SPA
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 400 MW
- EIA plant ID
- 68917
Location
38.3118, -93.9355
Nearby power plants
- Butler Municipal Power PlantOil-fired power plants · 10.9 MW · 22.4 mi
- Butler Solar Power ProjectSolar farms · 2.8 MW · 22.7 mi
- Harry TrumanHydroelectric plants · 161 MW · 28.9 mi
- HoldenGas power plants · 321 MW · 30.7 mi
- El Dorado Springs Solar FarmSolar farms · 2.5 MW · 31.5 mi
- Swan SolarSolar farms · 650 MW · 35.8 mi
- Ralph GreenGas power plants · 88.9 MW · 37.7 mi
- La CygneCoal power plants · 1,599 MW · 38.6 mi
- Dogwood Energy FacilityGas power plants · 655 MW · 38.7 mi
- NevadaOil-fired power plants · 21.6 MW · 38.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem